This instalment picks up the Kettle Falls dam after the power dam at the Falls. It is read from the 1986 National Park Service historic resource study by David L. Fritz and Lawrence F. Van Horn, a work of the federal government. It covers the treaty that created a new commission, the act of Congress, the hearings, and the decision of 1913.


The study records that the Bryce-Root Treaty followed negotiations in 1908 between Great Britain and the United States over boundary waters. It says the treaty was not ratified until May 5, 1910, and that the International Joint Commission, which the study calls an arbitrational body, had drafted its Rules of Procedure only by February 2, 1912.
The study adds that until the commission was called on, dam builders went to the two governments separately for whatever authorizations each could give. In the study’s account, the treaty’s preamble said it was intended to settle questions about boundary waters. The study also quotes a dissenting commissioner who named the prevention of disputes as an object of the treaty.
The study cites 36 Stat. 931, Chapter 156, of February 24, 1911, as the act by which the United States authorised the Kettle Falls dam. It says Congress treated the whole dam as if it would be in Saint Louis County, Minnesota, and that the act pointed to the General Dam Act of 1906 and its 1910 amendment as limits on E. W. Backus.
The study describes two channels between Namakan and Rainy Lake, with the international boundary running down the northern one. It says the island south of that channel, now called Kettle Island, lay entirely in Ontario. In the study’s reading, Backus therefore needed Canadian authorities for the southern channel and faced the full legal tangle at the international one.
The study records that on February 7, 1911 his Minneapolis lawyer, C. J. Rockwood, sent maps and plans to the Corps of Engineers office in St. Paul. It says Major Francis R. Shunk forwarded them to the Chief of Engineers with conditions: Corps supervision, booms for guiding logs, a fishway and a place for a navigational lock.
According to the study, Chief Engineer W. H. Bixby knew of the treaty and wrote that the case would need the approval of the commission as well as of the two governments. It records that Assistant Secretary of War Robert Shaw Oliver sent the application to the State Department in April 1911, without comment.
The study states that the Kettle Falls dam was the first item of business in the commission’s history, listed as Docket #1. It records that the three American members were appointed on March 9, 1911 and the three Canadians on November 10, 1911. It says the commission convened in Washington on April 2, 1912 to hear the case.
The study says James A. Tawney, chairman of the American Section, spoke before Rockwood could. Because the company had applied to both governments separately, Tawney saw no reason for the commission to consider the matter. Rockwood answered, in the study’s telling, that the Secretaries of State and War had sent the application on because they thought commission approval essential.
The study reports that Rockwood defined the high-water mark as
not the highest point to which water ever rises, but the point at which it remains long enough to make its mark.
The study also says commission members became absorbed in Rule 9 and Rule 6 of their own procedures. It quotes a 1981 Canadian staff member who admitted that lawyers weighted the early commission so heavily that questions of water flow and levels got lost.
The study records that in the Ottawa sessions of October 1912, Glyn Osler of Toronto, described as Backus’ principal legal representative there, said Ontario had given permission but the Dominion had not. According to the study, Thomas Chase Casgrain, the Canadian chairman, compared the application to a request to build half a dam. The study quotes him telling Rockwood, “we are not throwing obstacles in your way, Mr. Rockwood”.
Hearings resumed in Washington on November 18, 1912, the study says. It records that George H. Watson, a lawyer for lumber companies, argued that no application was properly before the commission. It says R. J. Powell of Minneapolis, also speaking for lumber companies, held that the Dominion’s consent was missing. The study records that John Thompson, King’s Counsel for the Dominion of Canada, argued the other way: the preamble called for a broad and liberal reading.
The study describes what stood at the Falls. It records a report of October 1912 that counted 15 hydraulic units on both sides of the river, with a maximum capacity of 29,693 horsepower. It also says that on the U.S. side “all six units were grinding pulp rather than generating electricity.”
The study, written from a national park’s point of view, sets against that the fears of those who floated timber. It says Watson’s clients suspected Backus might be handed a blank check on the watershed and become the absolute monarch of the region, deciding whose logs passed his dams. The study notes a March 1912 letter of protest from Ray L. Washburn of Leola, South Dakota, who feared his logs would be at the mercy of the dam owner. It adds that Horace I. Bedell, Commodore of the International Falls Boat Club, feared there would be no boat lock between Namakan and Rainy Lake.
The study states that on April 18, 1913 a majority of the commission found it had no jurisdiction. It records that the three Americans joined Casgrain in the majority, while Henry A. Powell and Charles A. Magrath dissented. In the study’s account, the majority treated a Dominion Act of July 20, 1905 and the act of February 24, 1911 as concurrent or reciprocal legislation, so the commission need not step in.
The study says the dissenters wrote eighteen pages. It quotes Henry Powell, who argued that the commission should assume jurisdiction even in doubt:
By pursuing such a course no possible injury could be done to anyone.
The study records that without Canadian Department of Public Works authorization, construction of the dam waited through all of 1912. It says that in September 1913 District Engineer S. J. Chapleau reported to the department’s Chief Engineer. He recommended approving the plans with extra sluices, a permanent stop-log or concrete dam within three years, a site for a canal, and flow regulated by authorities appointed later.
The study adds that an Order-in-Council of February 23, 1914 approved the plans, and that the dams were completed later that year. The study says Chapleau also urged that the matter of water levels be laid before the commission, which leads to the next instalment: how control of Rainy and Namakan water levels was arranged in 1914.
How the Falls Got Its Dam is a 10-part series read from federal records that are in the public domain — a National Park Service historic resource study of water-level regulation in the Rainy Lake watershed, and the Government Printing Office transcripts of International Joint Commission hearings. How the Falls Got Its Dam — part 5 of 10. Every statute citation, every date and every named order in it is checked automatically against the pages listed below before it is published, and every quotation is checked word for word against the scanned text. The scans carry machine-read text, and where the scan is rough this series says so rather than tidying it.